Commissioning support
for PV power plants

Manage the entire commissioning process in one workspace, from audits and documentation to PAC and FAC handover.

commissioning_support_hero

Streamline PV plant handover

Managing commissioning across scattered files and tools creates unnecessary technical risk and delays

No single source of truth

With documentation scattered across emails and folders, it’s difficult for EPCs, investors, and O&M teams to stay aligned.

Unclear ownership of issues

Managing punch lists manually leads to missed deadlines and lack of accountability for resolving critical site defects.

Limited readiness visibility

Without a structured environment, tracking progress toward PAC/FAC milestones becomes a guessing game instead of a data-driven process.

Late-stage technical risk

A lack of real-time oversight means technical problems often surface only at the final handover, leading to costly delays.

How does it work?

Comprehensive commissioning process

Solar Spy structures the entire commissioning process.
From the first audits and performance checks, through PAC, and final FAC acceptance.

PAC Phase

PAC, or Preliminary Acceptance Certificate, confirms that the installation is ready
to be handed over after the main works and tests have been completed.

Disconnection and configuration audit

Verification of the correct connection of all key installation components.

Initial performance study

Assessment of installation performance and identification of energy losses at an early stage.

Pre-PAC inspection

Detection of defects that should be removed before the official acceptance.

Official PAC inspection

Confirmation of workmanship quality and compliance with acceptance requirements.

Final PAC performance study

Summary of results and preparation of the project for completion of the PAC stage.

FAC Phase

FAC, or Final Acceptance Certificate, closes the commissioning process after the monitoring
period and confirms that the facility is fully ready for operation.

PAC–FAC period monitoring

Ongoing monitoring of the installation’s operation and detection of irregularities after preliminary acceptance.

Internal inspection, if required by the schedule

Additional technical inspection performed before final acceptance.

Official FAC inspection

Confirmation of the installation’s quality before the final handover of the facility.

Final FAC performance study

Final verification of the farm’s performance and readiness for operation.

Download the step-by-step
commissioning support brochure

Learn how to streamline the commissioning process and avoid delays during PAC & FAC acceptance.

Full visibility into the
commissioning process

Monitor progress in real time and manage every stage of the photovoltaic farm acceptance process.

Process progress in a single view

Stage statuses, current progress, and key process milestones are visible without switching between spreadsheets and messages.

FAC / PAC readiness

The team can see which conditions have been met and which items still need to be completed before the next acceptance stage.

Documentation readiness

Missing documents, required attachments, and the overall documentation readiness of the project are visible in one place.

Critical issue tracking

Open items, priorities, and corrective actions are organized within a single process structure.

What do you gain?

Less chaos, better control over the process,
and greater project readiness for acceptance

Process control

Statuses, stages, dependencies, and decisions in one place.

Documentation control

Full visibility into document completeness and acceptance requirements.

Fewer risks and delays

Faster detection of missing items, gaps, and critical points.

Better readiness for PAC and FAC

Monitoring of tests, requirements, and readiness for the next stages.

Collaboration across all parties

One process structure for the investor, EPC, asset manager, and advisors.

Greater predictability of acceptance

Less chaos at the end of the process, more control earlier on.